In M S Rajdarbar Heritage Venture Ltd. v. Dalbir Singh Yadav & Ors., O.M.P.(I) (COMM.) 335/2024, decided on 25 November 2026, the Delhi High Court (Mr. Justice Om Prakash Shukla) disposed of a Section 9 petition that had been in suspended animation for over a year — first disposed of in October 2025 with a direction that it be treated as a Section 17 application, then recalled because the Supreme Court stayed the arbitrator’s appointment, and now finally relegated to the tribunal after the SLP’s dismissal. The short order is a clean illustration of Section 9(3)’s division of labour: once an arbitral tribunal is constituted and able to act, interim protection belongs there.
A procedural tangle, untangled
The doctrine underneath
Three features of the 1996 Act’s post-2015 architecture make this choreography the norm rather than the exception:
| Provision | Role |
|---|---|
| Section 9(1) | Court-granted interim measures before and during arbitration, and after the award before enforcement |
| Section 9(3) | Once the tribunal is constituted, the court “shall not entertain” a Section 9 application unless the Section 17 remedy is inefficacious |
| Section 17 | The tribunal’s interim powers, co-extensive with the court’s, with orders deemed enforceable as court orders |
The inefficacy exception is narrow — typically engaged where the tribunal cannot act in time, a vacancy exists, or relief is needed against third parties beyond the tribunal’s reach. None of that applied once the sole arbitrator stood ready; the Court accordingly expressed no view on merits and left even the fate of its own status quo order to the tribunal.
Practice pointers for the handover moment
Ask for conversion, not dismissal. A Section 9 petition disposed of “as a Section 17 application to be considered afresh” carries the record and the urgency to the tribunal; a bare dismissal restarts everything.
Secure continuity expressly. The interim order should be directed to continue “until the tribunal considers the matter” — the formula used here — so no unprotected gap opens.
Unfreeze the tribunal formally. Arbitrators understandably defer when court proceedings about their own mandate are pending; a short application for directions, as filed here, is the right tool rather than informal correspondence.
Timetable the Section 17 hearing. The two-week direction to the arbitrator prevents the converted application from languishing — ask for it.
Frequently Asked Questions
What had stalled the arbitration?
The order appointing the sole arbitrator was challenged up to the Supreme Court, which stayed its operation — prompting the High Court to recall its October 2025 order converting the Section 9 petition into a Section 17 application. On 4 November 2026 the Supreme Court dismissed the SLP, making the appointment operative again; yet the arbitrator had deferred proceedings on 12 November, awaiting directions because the Section 9 petition remained pending.
What did the High Court direct?
Three things: the arbitrator may proceed with the arbitral proceedings, the basis for the earlier recall having disappeared; the Section 9 petition shall be treated as a Section 17 application and considered afresh by the arbitrator within two weeks; and the question of continuing, modifying or vacating the status quo order of September 2024 is left entirely to the tribunal.
Why do courts convert Section 9 petitions instead of deciding them?
Section 9(3) of the Arbitration and Conciliation Act, 1996 provides that once the tribunal is constituted, the court shall not entertain a Section 9 application unless circumstances exist rendering the Section 17 remedy inefficacious. Section 17, post-2015, gives the tribunal the same powers as the court, and its orders are enforceable as court orders. Conversion preserves the parties’ protection without parallel adjudication.
Does interim protection lapse during the handover?
Not if the order is drafted the way this one is: the existing status quo arrangement continues until the arbitrator takes it up. Counsel should always ask for an express continuity direction to bridge the gap between court and tribunal.